The inspections are done to control the quality is means by examining the products without the products any instruments. To examine the fabric, dyeing shed, garments measurements and so on according to specification or desired standard is called inspection.
Final inspection
Process Flow Chart of Final Inspection of Textiles

After completing finishing process here firstly check the shade as-per buyer std with dimensional stability from lab.

2ndly check dia /with white fabric weight or GSM.

3rdly check fabric surface or appearance as-per buyer STD.

The every roll with every meter check as-per 4-point system.

Make a report.

If ok then ready for delivery.

If not ok then identify the fault.

If it is knitting fault then inform knitting department, by Job card and mail & requested the fabric for replacement.

If it is Dyeing fault & if we make sure that it is re-process able then we give the job card to Dyeing Dpt. for correction and if is not re-process able then we reject the fabric & inform the dyeing to replace the reject Qty.